Athlone Group continue their success into 2012 and meet Claude S. Bouah-Kamon Ambassador for Ivory Coast to discuss infrastructure projects in the country

Athlone Group meets Finance Minister of Senegal.

His Royal Highness Prince Fahad Bin Migrin Bin Abdulaziz Al-Saud and Jojar S Dhinsa sign a multi-billion dollar MOU to work together on fuel projects in Africa.

Athlone Group meets to discuss mining concessions in Ethiopia with the Mining Minister, Her Excellency Sinknesh Ejigu

Dante Tanikie-Montagnani-Athlone Group pictured with Mines and Energy Minister Dr. Roosevelt Jayjay, of Liberia

Commercial Construction
  • Begins with the acquisition of land
  • Design and master-planning of project
  • Excavation of planned footprint
  • Installation of utilities (water, storm sewer, electrical)
  • Construction of buildings
  • Inspection of buildings
  • Final layer added to parking lots to finish development

 

Acquisition of Land

Athlone group has a trained team of professionals that have years of experience in the field of land purchase.  We can assist in the process of identifying and isolating the parcels of land that will maximize the client’s resources and make sure that all initial goals are met.  Athlone’s team goal is to assure that there are no surprises in the acquisition process.


 

Design and Master-planning

Athlone Group’s mission when assisting in the design and planning of a commercial development is to maximize the resources of the client to achieve their dream

By working closely with the client’s approving body, Athlone is able to present multiple scenarios based upon the goal of the development

Once the desired scenario is accepted, our engineers work to design the vision and present a master plan that will assure the project meets and exceeds the expectations of the client



Excavation

Truly the backbone of the development, the excavation phase begins by “rough cutting” in the parking lots and begin the actual dig down of the foundation of the building. This requires a predetermined depth based on the engineered specifications

This phase is also when the beginning of the utilities is ran and the base of the development is created


Installation of Utilities

Utilities are installed beginning with the storm sewer, sewer, and water to the base of the building for the beginning of the vertical expansion during construction

After these have been installed, the electrical lines are ran and connected so that construction may begin


Construction of Buildings

The most current methods and technologies are used to create the buildings

Multiple crews work in harmony to insure that the building is built with the highest standards of efficiency, highest standards of quality, and to insure that time schedules and budgets are met

 

Quality Control and Finishes

Although the buildings are constantly inspected and reviewed, this is the final inspection where the culmination of the inspections is realized in one final comprehensive evaluation.


Any changes or final corrections that need to be made are assessed at this point